Search results

In All results

VII for energy efficiency

VII for energy efficiency

As energy costs account for a substantial part of total operating costs, with these solutions, our customers get energy savings for reduced production costs.​

Services
Adaptive electricity production for power plants

Adaptive electricity production for power plants

Sustainable electricity production with higher revenue

Services
Valmet Equipment Diagnostics

Valmet Equipment Diagnostics

Valmet Equipment Diagnostics is a comprehensive fleet management tool designed for maintenance needs. Equipment condition is measured on-line and compared to the historical performance of the component, thus giving concrete measures about any change in operation.

Energy
Valmet Boiler Tube Deposit Inspection

Valmet Boiler Tube Deposit Inspection

Excessive scale deposit on boiler tubes results in costly energy losses and excessive boiler unavailability. Valmet's Boiler Tube Scale Deposit Measurement Program is an effective inspection service that will enhance your program and help us better understand the deposition within your boiler.

Services
Dissimilar metal weld inserts

Dissimilar metal weld inserts

Services
370° Tube Shields

370° Tube Shields

Services
Mechanical Seals

Mechanical Seals

To minimize the environmental impact Valmet has developed a new mechanical sealing system including double acting seals and closed loop water system which minimizes the water that enters the process. With this function you save fresh and waste water which results in reduced water costs and thermal energy savings due to less water to evaporate in the dryer.

Maintenance development and outsourcing

Mercer Lignin Center inaugurated with Valmet LignoBoost XS

Mercer Lignin Center inaugurated with Valmet LignoBoost XS

The state-of-the-art Mercer Lignin Center was inaugurated on August 23, 2023 at Mercer Rosenthal's site in Rosenthal am Rennsteig, Germany.

Insights ● Customer story
Major upgrade at Södra Cell Värö

Major upgrade at Södra Cell Värö

Södra Cell's Expansion Värö 2.0 plan will increase the capacity to 850,000 tonnes per year. The increase is taking place in two steps, with the first aiming to reach 780,000 tonnes per year by 2022.

Insights ● Article
Loading